Villa, Warehouse & BOQ Packages

Construction project and developer purchasing in Türkiye built around your BOQ

Whether developing a residential compound of steel villas, erecting a pre-engineered steel warehouse or factory building, mobilising a workforce camp or delivering a commercial fit-out, an incomplete quotation or missing connection interface costs far more on site than any unit saving. SerSourcing aligns Turkish manufacturer packages with your BOQ, drawings and site sequence.

Best Starting Scopes
  • Technical RFQ Brief (€390)
  • Source & Visit (€1,290)
Execution Control
  • Order to Shipment (€1,290)
  • Multi-supplier (€790)
Focus Points
Structure-to-envelope interfaces, submittals, bolt/flashing kits & phased dispatch
Technical Lead
Architect & Civil Engineer led coordination
Maltepe, İstanbul
Founder Technical & Procurement Review Tariff & Scope Verified: 2026-11-02
Prepared by İdris YAĞMAHAN Architect
Reviewed by Celalettin YAĞMAHAN Civil Engineer

Reviewed for technical terminology, Turkish factory field reality and published EUR scope boundaries (not statutory engineering sign-off).

Key starting details to share with us

  • Project BOQ extract, architectural/structural drawings and current revision register.
  • Clear distinction between named-brand / locked items and packages open to technical “or equal” proposals.
  • Submittal workflow: which mill certs, DoPs, samples and shop drawings your engineer/employer must approve before fabrication.
  • Site delivery sequence (foundation anchors first → primary steel/LGSF → sandwich panels/boards → windows/doors → fit-out) and crane/forklift limits.
Construction project and developer purchasing in Türkiye built around your BOQ — SerSourcing

Expose structure-to-envelope interface gaps before POs are signed

We organise project enquiries by BOQ package so missing anchor templates, purlin cleats, ridge flashings, window sub-frames, sealants and EN certificates are caught during Quotation Comparison—not when erectors open containers on site.

Track submittal preconditions and phased factory readiness

Stated factory lead times only start once Tekla/CAD shop drawings, RAL swatches and deposits are cleared. Our Order Follow-up (€590) and Order to Shipment (€1,290) programmes keep critical-path dependencies visible.

Continue Exploring
Clear Boundaries & Scope Answers

Frequently Asked Questions

Yes. Sequencing dispatch to match your site erection phases is one of the primary uses of Multi-supplier Coordination (€790) and our 30-day Buying Office plans (BO-30 / BO-55).

Fixed EUR Schedule · Free Initial Scope Review

Move your Türkiye purchase forward with a defined scope

Share your product specification, drawing or Turkish supplier details to receive a clear written scope and EUR fee confirmation before work starts.