SS-DESK €190 · SS-COMPARE €290 · SS-SOURCE €690
Pre-Deposit & BOQ Gate
Verify legal entity, manufacturing scope and normalised €/m² or LME+kg quotes before wiring an advance.
Loading brings together finished pallets, the packing list, the trailer or container and the handling crew. Having an independent observer on site documents package identifiers, visible condition, loading sequence and container/truck closure details.
SS-DESK €190 · SS-COMPARE €290 · SS-SOURCE €690
Verify legal entity, manufacturing scope and normalised €/m² or LME+kg quotes before wiring an advance.
SS-VISIT €490 · SS-TECH €790
Inspect active production lines, raw-material stock, QC gauges and export crating discipline on the shop floor.
SS-SAMPLE €190 · SS-ORDER €590 · SS-PRE €490
Lock reference samples, track milestone schedules and check finished batch dimensions, finishes and labels before balance payment.
SS-LOAD €390 · SS-MULTI €790 · BO-15 €1,250
Verify container condition, pallet tally, dunnage/lashing, moisture protection and seal number at dispatch.
Evidence standard: Every report distinguishes Observed on Site, Document-Supported and Supplier-Stated items. Field checks are visual/dimensional observations—not accredited ISO/IEC 17025 lab testing or statutory CE certification.
Inspect Open-Access Sample Report
| Code | Option | Fee (EUR) | Standard scope & main limits | Action |
|---|---|---|---|---|
SS-LOAD |
Loading Observation | €390 | 1 truck or container; 1 location; up to 4 hours; identity, agreed count/packing observations and permitted photos; no cargo securing certification | Select |
PK-SHIP |
Order to Shipment | €1,290 | Combines 30-day Order Follow-up + 1 Pre-shipment Check + 1 Loading Observation for one placed order. | Select |
Loading Observation (SS-LOAD, €390 in our core area) covers 1 truck or container at 1 loading address for up to 4 on-site hours. We record empty vehicle/container visual condition where accessible, plate/container numbers, package counts and labels against your packing list, visible crating/dunnage condition, loading progression and closing/seal numbers.
Need two containers or trailers loaded back-to-back during the same attendance at the same address? Add a second vehicle of the same product scope for €150, which includes up to two additional on-site hours without double-charging hourly overtime.
If visible damage, wet packaging or a count discrepancy appears during loading, we photograph it and alert your designated contact immediately so you can instruct the supplier or forwarder before departure. Physical forklift operation, lashing/securing engineering, road-weight compliance and carrier safety remain the responsibility of the supplier, loader and carrier.
On-site pre-dispatch review of accessible quantities, dimensions, labels, visible condition and export packing for up to 5 SKUs before balance release.
Align up to 3 Turkish suppliers and 3 purchase orders around one combined dispatch plan over 30 days—preventing trailer mismatches and missing packing data.
Structured 30-day remote tracking for 1 supplier and 1 purchase order—with 4 scheduled written status updates, open-items register and 1 review call.
Inspect the structure of a SerSourcing report—including the editable template and three fictional training examples separating observations from statements.
Yes. Much of Türkiye’s building-material trade to Romania, Bulgaria, Germany, France and Italy moves by road trailer, and we adapt the checklist to trailer plates, side/rear loading sequence and strap protection.
No. Loading Observation documents external package IDs, counts, visible condition and loading sequence. Product dimensional and visual quality checks should be booked beforehand via Pre-shipment Check (SS-PRE, €490).
The first vehicle is €390 (up to 4 hours) and a second vehicle at the same address, during the same attendance and scope, is +€150 (adding up to 2 on-site hours without duplicate hourly overtime).
We never add silent unlimited overtime. Before the included 4 hours expire, we contact you with the status so you can choose whether to approve overtime (€75/hr in 30-minute increments), conclude or reschedule.
No. SS-LOAD is a commercial buyer’s observation record. Where heavy steel or project cargo requires a licensed marine surveyor or lashing certificate, we can help coordinate a specialist surveyor separately.
We photograph the loaded stages, record the exact discrepancy against the packing list and notify your decision-maker immediately while the vehicle is still on site.