1. Buyer decision checklist: anchor the visit to one concrete gate
Every productive factory visit starts by naming the exact commercial gate waiting on the outcome. A capability visit prior to placing a first trial order looks at completely different evidence than a pre-dispatch visit checking whether 24 pallets of boards or steel frames match a placed purchase order. Mixing vague goals produces scattered notes.
Complete this Buyer Decision Checklist internally before requesting a visit date:
- Decision gate: Are we deciding whether to shortlist, pay an advance deposit, approve a first-article run or release shipment collection?
- Top 3 deal-breakers: Which three technical or operational facts would cause us to pause or walk away if unconfirmed?
- Commercial context: What order volume, repeat frequency and target dispatch date are we discussing with the supplier?
- Specialist boundaries: Does any requirement actually need accredited laboratory testing, NDT weld inspection or formal engineering sign-off alongside or instead of visual attendance?
- Internal sign-off owner: Which buyer, architect or engineer in our team will read the report and make the next commercial call?
2. Site access and appointment checklist: avoid wasted trips
In Türkiye’s manufacturing sectors, a supplier’s registered invoice address or export showroom in İstanbul frequently sits 40 to 150 kilometres away from the organised industrial zone (OSB) where roll-forming, pressing, coating or crating actually takes place—or secondary finishing such as hot-dip galvanising is performed at a partner plant. Under our published EUR tariff, a standard Factory Visit (SS-VISIT, €490) covers one physical site for up to four on-site hours; a second address is a separate site.
Confirm every item on this Access & Appointment Checklist in writing before travel is booked:
- Exact physical plant street address, OSB zone/parcel number and Google/navigation pin of the facility to be inspected.
- Confirmation of which processes happen inside that specific facility versus sister plants or external subcontractors.
- Named host contacts attending on the day—ensuring production/quality staff (not only export sales) are available for technical questions.
- Confirmation of whether relevant production lines or similar product families will be running during the appointment window.
- Site rules on visitor PPE (safety shoes, helmets, hi-vis), photography/video permissions and mobile signal for any optional brief call.
3. Drawing, quotation and confidentiality checklist
Arriving on site when the buyer holds Revision C of a profile drawing while the factory’s production manager is looking at unrevised Email Sketch A wastes valuable floor time. Assemble a single synchronised briefing folder 48–72 hours prior to attendance—and share only documents you are authorised to disclose:
- Current supplier quotation / proforma invoice with date, item codes, unit prices and stated delivery terms.
- Controlled drawings or product datasheets showing revision numbers, critical dimensions and tolerances.
- Prior sample references, colour swatches or batch codes if a sample was previously approved.
- Confidentiality check: redact unrelated client/project title blocks or arrange NDA terms before transmitting proprietary designs.
- Document-page count check: up to 5 documents / 25 pages fit a preliminary desk check (
SS-DESK), while up to 10 drawings / 50 pages fitSS-TECH(€790).
4. Facility and process checklist: what to examine on the floor
Sharing a clear topic outline with the host manufacturer ahead of time is good B2B practice—it is not “giving away exam answers”. Cooperative Turkish manufacturers appreciate knowing whether to have raw-coil mill certificates, packaging timber samples or a specific project batch accessible in an inspection bay rather than buried three pallets high.
Tailor this Facility Preparation Checklist to your building-product category:
- Raw-material intake & storage: indoor vs outdoor storage, coil/board batch labels, moisture protection and segregation of grades.
- Core forming / fabrication route: active machinery observed, tooling/setup discipline, in-process dimensional checks and rework handling.
- Surface treatment & interfaces: coating/painting steps (in-house vs subcontracted), cut-edge protection, curing and finish inspection.
- Quality & document records: shop-floor travellers, calibration tags on measuring tools, internal inspection logs and mill/product test files matching your spec.
- Export packing & dispatch yard: pallet bearers, corner protection, plastic hooding, strapping tension, part/package labelling and forklift/crane loading gear.
5. Model 4-hour on-site agenda (240 minutes structured allocation)
Without timekeeping, opening conference-room conversations easily absorb half the appointment, leaving 20 rushed minutes for the warehouse before departure. Below is the balanced 4-hour (240-minute) on-site structure designed for a standard SS-VISIT (€490 in our core corridor; up to 6 hours available under SS-TECH at €790):
| Time block | Duration | Primary activity on site | Evidence captured for report |
|---|---|---|---|
| Block 1 · Opening alignment | 20 min | Confirm attendees, safety/photo permissions, entity role and exact agenda items | Attendee list, stated company role & access rules |
| Block 2 · Production walkthrough | 60 min | Walk raw-material storage, primary forming/fabrication lines and finishing areas | Direct process observations & permitted floor photos |
| Block 3 · Product & spec review | 60 min | Examine similar/active items, critical dimensions, tolerances, joints and accessories | Scoped spot checks vs buyer drawing/spec reference |
| Block 4 · Document & traceability check | 40 min | Review available mill tags, internal QC logs, datasheets and test references on site | Document IDs, dates, scope alignment & gaps |
| Block 5 · Packing & loading review | 30 min | Inspect export pallets, wrapping, corner guards, labels and loading bay method | Packing observations & handling constraint notes |
| Block 6 · Open-items wrap-up | 30 min | Summarise unverified points, missing files and agreed follow-up dates with host | Structured Open-Items Register with owners & due gates |
6. Post-visit reporting discipline and buyer next steps
Immediately after site attendance, notes, document references and permitted photographs are compiled into a structured English report (targeted within 2 business days for SS-VISIT and 3 business days for SS-TECH). If an urgent red flag emerges on the floor—such as unannounced subcontracting, wrong material thickness or unready goods ahead of a booked truck—we communicate that material issue straight away rather than holding it back for administrative formatting.
Remember what a prepared visit achieves: it gives your team verified eyes and structured evidence for the agreed checklist at that facility and time, while keeping commercial order release, engineering approval and any specialist laboratory testing cleanly in their proper lanes.