Skip to content
Core field area: İstanbul Anatolian & Kocaeli corridor · Outside corridor by agreed quote
SS-TECH · ISO 1461 HDG Sample SSR-2026-HDG-07 7 min read

Scaffolding, Formwork & Mezzanine Galvanizing (EN ISO 1461) Sample Report

See how SerSourcing verifies hot-dip galvanized zinc coating thickness (EN ISO 1461), ledger/rosetta dry-fit tolerances, grated walkway welds and stackable export cradles for warehouse mezzanines and scaffolding systems.

Open-access preview — zero email wall or newsletter spam.

Founder Technical & Procurement Review Tariff & Scope Verified: 2026-11-02
Prepared by Celalettin YAĞMAHAN Civil Engineer
Reviewed by İdris YAĞMAHAN Architect

Reviewed for technical terminology, Turkish factory field reality and published EUR scope boundaries (not statutory engineering sign-off).

Active Corporate Specimen: SSR-2026-HDG-07 · Scaffolding & HDG Report
Commission This Scope on WhatsApp
SerSourcing TECHNICAL SOURCING, FACTORY AUDIT & BUYING-OFFICE DIVISION
DOCUMENT CONTROL Page 1 / 2
Document Ref.
SSR-2026-HDG-07
Tariff / Scope
SS-TECH (€790) / SS-PRE (€490)
Issue / Revision
Rev. 02 · 2026-11-02
Classification
SPECIMEN · NDA ANONYMIZED

HOT-DIP GALVANIZING (EN ISO 1461) & DRY-FIT TRIAL DOSSIER

Product Scope: 42 Tons Ringlock Scaffolding Standards/Ledgers (Ø48.3×3.2 mm S355JR) + Warehouse Mezzanine Walkways & Gratings

ILLUSTRATIVE CORPORATE SPECIMEN (ZERO CLIENT DATA DISCLOSED): Client names, factory identities, heat/certificate numbers and commercial figures in this specimen are fictionalized to protect strict B2B NDA confidentiality. Scoped commercial/visual engineering record — not an accredited laboratory test certificate or statutory structural sign-off.

01 · ASSIGNMENT REGISTER & EXECUTIVE GATE SUMMARY

Commissioning Buyer Profile [REDACTED — Industrial Access & Warehouse Fit-Out Contractor, Italy]
Industrial Corridor & Travel Rule Kocaeli – Sakarya / Ankara Structural & Galvanizing Corridor
Referenced Technical Standards EN 12810 / EN 12811 · EN ISO 1461 Hot-Dip Galvanizing · EN 10219 S355JRH Tube
Verification Instruments & Basis Magnetic Zinc DFT Gauge, Vernier Caliper, Mock-Up Bay Dry-Fit Test, Hammer/Visual Adhesion Check
Standard Tariff & Turnaround €790 (SS-TECH) · Target Delivery: 3 Business Days After Site Attendance
86 µm Avg. Hot-Dip Zinc Coating (HDG)
3.22 mm Measured Ø48.3 Tube Wall
2-Bay Trial Full Ringlock Dry-Fit Erected
1 QC Action Wedge-Slot Zinc Fettling
Executive Gate Recommendation: PASSED TECHNICAL FIT-UP — 1 ZINC ASH FETTLING ITEM LOGGED

Robotic MIG rosetta welds, Ø48.3 × 3.22 mm S355JRH tube wall thickness and EN ISO 1461 hot-dip zinc thickness (average 86 µm vs >=55/70 µm requirement) met buyer specification across 20 sampled standards and ledgers. Minor zinc ash/icicle build-up inside 3 wedge slots was fettled clean during the visit; full lot de-burring check required prior to strapping.

02 · SCOPED TECHNICAL OBSERVATIONS, MEASUREMENTS & COMPARISON MATRIX

Ref. Subsystem / Inspection Parameter Buyer Specification / Benchmark Recorded Field / Desk Evidence Evidence Basis Required Buyer / Supplier Gate Action
CHK-01 Structural Tube Diameter, Wall Gauge & Steel Grade EN 10219 Ø48.3 × 3.20 mm S355JRH (not 2.5–2.7 mm S235 domestic tube) Sampled 12 uncoated tubes on saw line: OD 48.35 mm, wall 3.19–3.24 mm; 3.1 mill cert Heat #T-9104 confirmed S355JRH. Observed / Verified Compliant; tube wall thickness & grade verified.
CHK-02 Robotic Rosetta & Wedge-Head Weld Geometry Full twin-fillet robotic MIG weld @ 500 mm centers, zero undercut/spatter 2-cell robotic welding station active; fillet throat uniform (3.5 mm); captive cast wedges seated flush. Observed / Verified Acceptable; retain WPS/welder records in handover file.
CHK-03 EN ISO 1461 Hot-Dip Galvanizing Thickness (DFT) Mean >= 70 µm (steel >=3 mm <6 mm), local min >= 55 µm 40 magnetic readings across standards, ledgers & stair stringers averaged 86 µm (local min 68 µm, max 108 µm). Observed / Verified Exceeds EN ISO 1461 Table 3 minimum coating thickness.
CHK-04 2-Bay Full-Height Dry-Fit Erection & Wedge Locking Plumb spigot coupling, diagonal brace pin fit & walkway hook seating Assembled 2×2.57 m bays + steel toe-boards + mezzanine grating panel on yard slab; diagonals locked smoothly. Observed / Verified 3 rosetta slots had minor HDG zinc icicles; filed clean on site.
CHK-05 Mezzanine Electro-Forged Floor Grating & Stair Treads 30×3 mm bearing bar, 33×33 mm mesh, anti-slip nosing, HDG finish Bearing bar measured 30.1 × 2.98 mm; saddle-clip bolt packs bagged and tagged per mezzanine bay. Observed / Verified Ready for palletizing; confirm clip count +5% spare.
CHK-06 Stackable Steel Transport Cradles & Bundle Strapping Forklift-stackable galvanized steel stillages (<=1,200 kg/cradle) for 40' OT/trailer Standards loaded in steel stillages with 32 mm steel bands; timber dunnage lacked visible IPPC HT mark on 2 skids. Open / Hold Gate Replace 2 unstamped timber skids with IPPC HT stamped dunnage before loading.
Inspection & Sampling Basis

Scoped B2B visual field verification, random dimensional spot-sampling and documentary cross-check.

Metrology & Traceability

Field gauges zero-checked prior to measurement; heat/batch IDs cross-referenced against presented 3.1 MTCs.

Commercial Payment Gate Rule

Advance or balance wire release remains conditional upon closing all Open / Hold items logged on Sheet 2.

SerSourcing — Operated by CFY Mühendislik Mim. Dan. Yapı Malz. İnş. San. ve Tic. Ltd. Şti. · Maltepe, İstanbul SSR-2026-HDG-07 · Page 1 / 2
SerSourcing · CFY Mühendislik Mim. Dan. Yapı Malz. İnş. San. ve Tic. Ltd. Şti. CORPORATE ENGINEERING & PROCUREMENT DOSSIER — CONTINUATION SHEET
SSR-2026-HDG-07 Rev. 02 · 2026-11-02 Page 2 / 2

03 · CROSS-REFERENCED EVIDENCE & ANNEX REGISTER

TUBE-A1 Logged in Dossier
Uncoated S355JRH Tube Caliper & Mill Cert Match

Wall thickness caliper photos prior to galvanizing kettle immersion.

HDG-B2 Logged in Dossier
40-Point EN ISO 1461 Zinc Thickness Log

Recorded micron distribution on tubes, rosettas, base jacks and gratings.

FIT-C3 Logged in Dossier
2-Bay Ringlock & Mezzanine Grating Dry-Fit Photos

Assembled bay diagonal squareness, wedge seating and stair stringer fit-up.

PACK-D4 Logged in Dossier
Steel Stillage & Strapping Cradle Tally

Cradle gross weight tags and forklift stacking pocket verification.

04 · OPEN-ITEMS ACTION REGISTER BEFORE COMMERCIAL RELEASE

Item ID Open Technical / Commercial Point Action Owner Target Release Gate
OI-01 Perform 100% hand-gauge pass on rosetta wedge slots after HDG bath to clear any solidified zinc droplets before bundling. Factory QC Crew Before Stillage Strapping
OI-02 Swap 2 unstamped timber under-skids for IPPC ISPM-15 heat-treated skids. Dispatch Warehouse Before Trailer Arrival
OI-03 Attach EN 12810/12811 certificate reference and EN ISO 1461 galvanizer declaration to shipping pack. Supplier Export Desk With Final Invoice

05 · EVIDENCE CLASSIFICATION KEY & CORPORATE SCOPE GOVERNANCE

Observed / Verified

Directly witnessed, counted or measured on site/desk by SerSourcing within the agreed assignment window.

Document Reviewed

Recorded from supplier-submitted certificates, MTCs or drawings without assuming physical lot testing.

Supplier-Stated

Verbal or written manufacturer statement recorded transparently; requires independent verification.

Open / Hold Gate

Unresolved technical or commercial hold item recommended for closure prior to stage payment/dispatch.

Governance & Independence Standard: Issued under buyer-representation tariff SS-2026-11-V2. Zero undisclosed supplier commission. Goods contracts, product warranties, accredited EN ISO/IEC 17025 lab testing and statutory engineering sign-off remain with the respective contracting parties and appointed specialists.

06 · DOCUMENT REVISION LOG & CONTROLLED DISTRIBUTION REGISTER

Rev. Date Revision Status & QA Milestone Authorized Distribution & Archive Retention
Rev. 01 2026-10-30 Initial field / desk observation log, dimensional check sheet & annex index. Internal Engineering Desk QA Review (Maltepe HQ)
Rev. 02 2026-11-02 QA-verified corporate engineering dossier & executive gate recommendation. Commissioning Buyer (1× Encrypted PDF + Annex ZIP) · 5-Yr NDA Archive

07 · BUYER CONTRACT, PAYMENT & DISPATCH SAFEGUARD PROTOCOL

GATE-01 Proforma & Technical Specification Rider

Bind verified steel grade, coating mass, tolerances and export packing rules directly into the signed Proforma Invoice.

GATE-02 Lot-Specific Certificate & Export Pack

Verify batch-allocated EN 10204 3.1 MTC, CE DoP, packing list and draft A.TR/EUR.1 48h prior to balance wire.

GATE-03 Pre-Shipment & Loading Gate Witness

Confirm final piece count and dunnage via SS-PRE (€490) or SS-LOAD (€390) before high-security bolt seal closure.

GATE-04 Strict NDA & Zero-Commission Mandate

Issued exclusively for commissioning buyer internal governance; SerSourcing accepts zero supplier commission (0%).

Prepared By (Field / Desk Lead) Celalettin YAĞMAHAN Civil Engineer · Co-Founder
Maltepe, İstanbul · 2026-11-02
Technical Quality Review By İdris YAĞMAHAN Architect · Co-Founder
QA Control · SSR-2026-HDG-07
Corporate Verification Seal
Tariff SS-2026-11-V2 · MERSİS: 0209128951200001 · Tax ID: 2091289512 · sersourcing.com SSR-2026-HDG-07 · Page 2 / 2

Why Scaffolding, Formwork & Mezzanine Buyers Audit Tube Gauge and ISO 1461 Microns

Once scaffolding tubes or mezzanine beams are hot-dip galvanized, visual appearance alone cannot distinguish a 2.5 mm S235 light tube from a 3.2 mm S355JR structural standard, nor can it catch zinc droplets blocking rosetta wedge slots until erection crews are on site.

Our Technical Review (SS-TECH €790) and Pre-shipment Check (SS-PRE €490) combine wall-gauge verification, multi-point EN ISO 1461 magnetic DFT readings, and a mandatory 2-bay yard dry-fit assembly.

  • Verifies Ø48.3 × 3.2 mm S355JRH vs thinner domestic tube stock and checks EN 10204 3.1 heat numbers.
  • Distinguishes true kettle hot-dip galvanizing (70–95 µm EN ISO 1461) from thin pre-galvanized strip (15–20 µm).
  • Tests real ledger/diagonal wedge locking and mezzanine grating clip seating on the factory yard before export.
More Corporate Deliverable Specimens

Explore Other Sector & Engineering Report Samples

SS-SAMPLE · Board & Wool Sample

Board & Wool Sample Report

Corporate sample verification & unit-area normalization dossier for fibercement boards (Betopan), moisture/fire gypsum drywall and stone-wool batts: caliper thickness, density check, m² price normalization and pallet moisture wrap.

SS-PRE · Facade & Door Sample

Facade & Door PSI Report

Pre-shipment inspection corporate dossier for thermal-break aluminum villa windows, curtain-wall mullions and steel/fire entrance doors: 6063-T6 wall gauge, polyamide strip, Qualicoat/anodized microns and hardware kit count.

SS-SOURCE · Solar Steel Sample

Solar Carport RFQ Report

Corporate supplier shortlist & capability screening dossier (SS-SOURCE €690) for PV solar ground-mount structures, industrial steel solar carports and aluminum roof rails: 5 factories researched, 3 verified candidates compared.

Continue Exploring
Clear Boundaries & Scope Answers

Frequently Asked Questions

Kettle hot-dip galvanizing (EN ISO 1461) coats the finished welded steel component inside and out to typically 55–95+ µm, protecting welds against site corrosion. Pre-galvanized strip tube usually carries only 15–25 µm of zinc with sprayed cold-zinc paint over weld seams.

Fixed EUR Schedule · Free Initial Scope Review

Move your Türkiye purchase forward with a defined scope

Share your product specification, drawing or Turkish supplier details to receive a clear written scope and EUR fee confirmation before work starts.

WhatsApp Sourcing Desk